Details: clearing and grubbing road land including uprooting rank vegetation, grass, brushes, shrubs, sapling and trees girth up to 300 mm (light jungles) & removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking the serviceable materials to be used or auctioned up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150mm in thickness etc. complete as per direction of the engineer-in-charge. earthwork in all kinds of soil except sand, sandy or slushy soil in borrow area by mechanical means and transportation of excavated earth by mechanical means with all leads, lifts, delfts, rehandling, conveyance, royalty, cess, including loading and unloading the same on prepared and approved surface including rough dressing and breaking the clods to maximum 5 cm. to 7 cm. in size and laying in layers not exceeding 22.5 cm.layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding waterin
Sector: Irrigation