Details: excavation of foundation in stony earth not requireing blasting with initial lead of 50 mtr and lift of 1.5 mtr including dressing leveling the bed. labour for laying stone dust in sub-base in layers not exceeding in 22.5 cm , watering and compacting to the required density in o.m.c with prr including cost and conveyance.10mm thick. providing , laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with pavers in sub-base/base course on well prepared surface and copacting with vibratory roller to achive the desired density as per clause 406 of mosrt&h specifications for road works.page-166, item no.-42 reinforced cement concrete of m-20 grade with 20 mm and down grade black hard crusher broken granite stone chips of approved quality & from approved quarry including lowering, laying the concrete, watering a
Sector: Municipality