Details: excavation of foundation in all kinds of soil to proper section and profile with all leads, lifts and delifts including dressing and levelling the bed to proper and level and making it fit for laying concrete and depositing the excavated materials away from the work site with all leads, lifts and delifts including dewatering if necessary from foundation with all labour and t&p required for the item complete in all respect as directed by engineer-in-charge.(measurement to be taken on finished level section for construction of afflux bundh & upstream overburden cutting and deduction of settelment of 12.5% will be made in filling section) cement concrete m15 with 20 mm size crusser broken granite metal & down graded of approved quality quarried and free from weathered skin including lifting the materials lowering, hoisting and laying the concrete for required level with curing ramming finishing etc. complete in all respect to proper and level with cost, conveyance, royalty and other
Sector: Irrigation