Details: clear water pumping main (di-k9 & k7),fittings & civil works cutting asphalt or bituminous road of flexible pavments and disposal of dismantalled materials up a lead of 1000 mtr stacking servicable and unservicable materials separately including cost of all labour, t & p etc. all complete as per the direction of engineer-in-charge. 150mm dia di (k7) 200mm dia di (k7) cutting concrete road of grannualar course of flexible pavments and disposal of dismantalled materials up a lead of 1000 mtr stacking servicable and unservicable materials separately including cost of all labour, t & p etc. all complete as per the direction of engineer-in-charge. 150mm dia di (k7) 200mm dia di (k7) supplying all labour, t&p and earth work excavation in following kinds of soil within initial laed of 50m & initial lift of 1.50m including rough fressing breaking clods and laying in layers not exceeding 0.30m. in depth, levelling the bed, using pans, vessels for slushy soil and including sundries supe
Sector: Water supply and Sewerage