Details: supplying of all labour t & p materials etc for earth work in excavation in hard soil in foundation within initial lead and lift including rough dressing and levelling the bed etc. to complete. (a) 1st depth of 1.50 mtr. (b) 2nd depth of 1.50mtr.(upto 3.0 mtr.) supplying of all labourt & p materials for earth work in stony earth and gravelling mixed with stonr boulder with in 50.00 mtr initial lead and 1.50 mtr initial lift including rough dressing & levelling the bed as per the direction of engineer in charge. (c ) 3rd depth of 1.50mtr.(upto 4.5 mtr.) (d) 4th depth of 1.50mtr.(upto 6.0mtr.) supplying of all labourt & p materials for cutting in d.i rock not requireing blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed as per the direction of engineer in charge. (e) 5th depth of 1.50mtr.(upto 7.5mtr.) (f) 6th depth of 1.50mtr.(upto 9.00 mtr.) (e) 7th depth of 1.50mtr.(upto10
Sector: Water supply and Sewerage