Details: clearing and grubbing road land including uprooting wild vegitation, grass, bushes, shrubs, saplings and trees of girth upto 300mm,removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per technical specification clause-201. earthwork in hard soil in excavation of foundation with initial lead & lift including roughdressing and levelling the the beds , cost of all t&p labour etc.complete. filling foundation and plinth with sand well watered and rammed including cost, conveyance ,royalty of all materials labour, t&p, etc. complete. c.c.m10 using 40 mm size h.g. metal well rammed with cost, conveyance, royality, taxes of all materials and all labour, t&p, etc. complete. fly ash brick masonary in cement mortar (1:6) in foundation and plinth using fly ash bricks of 9"/10" size having a cr
Sector: RDPR