Details: dismaintling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead t&p required for the work etc complete as directed by the engineer in charge. excavation of earthwork in foundation in hard soil within all lead, lift including rough dressing and levelling the bed and depositing the excavated materials within all leads from the work site including sundries, t&p required for the work etc complete as directed by the engineer in charge. filling foundation and plinth with sand of approved quality with all leads, lifts, delifts, well watered and rammed including cost, conveyance, royalty cess& all taxes of all materials t&p etc. complete, as per direction of engineer-in-charge. providing and laying cement concrete (1:3:6) using 40 mm hard granite crusher broken metal and sharp sand of approved quality from approved quarry, mixing, hoisting, lowering, laying, compacting and curing for specified days with cost, conveyance, roya
Sector: Irrigation