Details: clearing shrub jungles including uprooting of stumps and small bushes and trees below 1.00m girth based on pre-measurement including removal of debris and depositing the same, clear of work site with all leads, lifts complete as directed by the engineer-in-charge. excavation, loading, unloading and carriage by mechanical means of kinds of soil including stoney earth, gravel and moorum etc interspread with boulders up to 1/2 size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the engineer - in- charge within an initial lead of 1 km from the place of excavation complete. cement concrete m-15 using 20 mm down graded for cc work with crusher broken hard granite aggregate of approved quality from approved quarry and free from weathered skin quarry and foreign materials mixing by concrete mixer including lifting the materials hoisting lowering and
Sector: Irrigation