Details: providing stone rip-rap, aprons to the slopes of dam, , & flood bank with quarried stone boulders of size 0.30m and above including dumping on slopes filling with small stones & wedges & packing surface to proper line and level including fixing wave breakers complete with all leads, lifts & delifts, t & p, all labour, cost, conveyance, royalty all materials etc. complete and as directed by the engineer-in-charge.
Sector: Irrigation