Details: supplying all labour and t & p for earth work excavation in trenches for pipe line in all kind of soil within 50 m initial lead & 1.50 mtr. initial lift including rough dressing and breaking of clods to maximum 5 cm to 7 cm & laying in layers not exceeding 0.30 m in depth as per the direction of engineer-in-charge. supplying all labour, t&p and laying in trenches centrifugally cast (spun) ductile iron pressure, socket and spigot pipes class k-9 / k-7 with cement mortar lining and bituminus painting conforming to is:8329-2000 of the following nominal diameter excluding cost of pipe and rubber ring as per specification complete. (earthwork intrenches to be measured and paid for separately) laying of d.i. pipe 200 mm dia. d.i.pipe (class-k-9) 400 mm dia. d.i.pipe (class-k-9) cost of fittings 200mm dia k-9 pipe 400mm dia k-9 pipe supplying all labour,t&p, materials and making push - on joints confirming to is:3114 - 1994 centrifugally (spun) cast iron or ductile iron pipes using rubbe
Sector: Water supply and Sewerage