Details: earth work in excavation of foundation in hard soil including dressing and levelling the bed to required section, breaking clods to maximum 5 cm to 7 cm and depositing the excavated materials away from work site in layers not exceeding 0.3m in depth with all leads, lifts and delifts including dewatering, shoring, shuttering, etc. if required, all labour charges, t&p, b & o.c. workers welfare cess etc. complete as directed by the engineer-in-charge filling in foundation bed with sand of approved quality including watering & ramming with all leads, lifts and delifts including cost, conveyance, royalty & taxes etc. of all materials, all labour charges, t & p, b & o.c. workers welfare cess etc. complete as directed by the engineer-in-charge. cement concrete (1:3:6) with 40mm size hard granite crusher broken metal of approved quality free from weathered skin surface and any other deleterious materials with all leads, lifts & delifts including cost, conveyance, royalty & taxes etc. of a
Sector: Irrigation