Details: cleaning shurb jungle including uprooting stumps & small bushes and removal of up to a distance of 50m outside the periphery of the area. as directed by the engineer-in-charge. dismantling brick or stone masonry in lime or cement mortar under 3m.height including stacking the useful materials for reuse and removing the debris with all lead with all labours t&p as required etc complete. as directed by the engineer-in-charge. excavation of foundation in all kind of soil to proper section and profile with all leads, lifts and delifts including dressing and levelling the bed to proper and level and making it fit for laying concrete and depositing the excavated materials away from the work site with all leads, lifts and delifts including dewatering if necessary from foundation with all labour and t&p required for the item complete in all respect as directed by engineer-in-charge. filling foundation & plinth with sand including watering & ramming to all heights with all leads & lifts wi
Sector: Irrigation