Details: cutting asphalt or bituminous road of flexible pavments and disposal of dismantalled materials up a lead of 1000 mtr stacking servicable and unservicable materials separately including cost of all labour, t & p etc. all complete as per the direction of engineer-in-charge. 500mm dia di (k9) cutting concrete road of grannualar course of flexible pavments and disposal of dismantalled materials up a lead of 1000 mtr stacking servicable and unservicable materials separately including cost of all labour, t & p etc. all complete as per the direction of engineer-in-charge. 500mm dia di (k9) excavation of founation in hard rock (granite) removed by chiselling including dressing and levelling the bed not exceeding 1.5m in depth and depositing the soil within initial lead of 50m and as per specification approved by the department 0.0 to 1.5 1.5 to 3.0 3.0 to 4.5 4.5 to 6.0 6.0 to 7.5 7.5 to 9.0 supplying all labour, t&p and earth work excavation in following kinds of soil within initial la
Sector: Industry Development