Details: providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost, conveyance, royalty, taxes of all materials and hire & running charges of machineries, cost of all labour, t&p with all cost of incidental charges and cess etc. complete as per drawing, specification and direction of the engineer-in-charge providing & applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer @ 0.60kg/sqm using mechanical means as per clause 502 of mort&h specifications for road & bridge works (4th. revision) including cost, conveyance, taxes of all materials, hire and running charges of machinaries, cos
Sector: Irrigation