Details: clearing and grubbing light jungles (covered with plants less than 30cm girth and open space between 50% to 70% oin premeasurement including disposing of the debrises clear of work site with supply of all equipment tools and plants labour, labour cess required for the work etc. complete as per direction of engineer-in-charge. excavation in all kind of soil including moorum,stoney earth,gravel etc.excepting all kinds of rocks & boulders exceeding 0.014cum in volume for dam base stripping,cut-off trenches,outfall drains and stripping in borrow areas including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 1.5m initial lift as per the direction of engineer-in-charge including stacking of useful materials as directed by the engineer in charge. excavation of any good quality soil by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 2km on properly prepared and sc
Sector: Irrigation