Details: clearing & grubbing shrub, jungles including uprooting stumps of trees and trees below 1.0 m. girth and thick bushes including bamboo clamps based on pre-measurement disposing the debris away from the work site with all leads, lifts and delfts with cost of all labour, t & p, hiring and running charges of all machineries, cess complete as per direction of engineer-in-charge. earthwork in all kinds of soil in excavation of foundation trenches with initial lead and lift including rough dressing in layers not exceeding 0.3 mtr in depth and the earth transported by transport vehicle including moorum , hard stony earth and earth mixed with boulders except sheet rocks and boulders requiring blasting with initial lead and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, t & p for shoring, shuttering, dewatering if required, t & p etc as required for the work complete as di
Sector: Infrastructure