Details: clearing shrub jungles and uprooting stumps and small bushes and trees of below 1 meter girth on pre-measurement including removal of debris and depositing the same clear of work site with all leads, lifts and de-lifts etc., with supply of all labour and t&p required for the work etc., complete in all respect as directed by the engineer-in-charge. excavation in all kinds of soil including moorum, stoney earth, gravel etc. excepting all kinds of rock & boulders exceeding 0.014 in volume in reservoir area above dsl by mechanical means, loading into and transportation by mechanical means and unloading the soil for dumping the excavated materials at designated place to be decided in consultation with district administration away from work site (bidders requested to visit site and assess govt. land for disposal and quote rate accordingly, later claim for discrepancy in lead adopted in estimate and actual lead at time of disposal will not be entertained) including construction and maintena
Sector: Irrigation