Details: earth in excavation of foundation and trenches in hard soil within 50m lead and 1.5 m lift including rough dressing and breaking colds to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 m in depth and as per specification complete. supplying, filling foundation & plinth with sand including watering, ramming, cost, conveyance, royalty, taxes of all materials and labour (t&p) etc. complete. p.c.c. (1:4:8) using 40mm size b.h.g.c.b. metal including watering, curing with cost, conveyance, royalty and taxes of all materials and labour etc. complete. p.c.c. (1:2:4) using 12mm size b.h.g.c.b. metal including watering, curing with cost, conveyance, royalty and taxes of all materials and labour etc. complete. cutting, bending and binding of m.s. rod and tor steel from sail / rinl / tiscon including cutting,bending,binding and tying the grills placing in position for r.c.c.work with cost ,conveyance, taxes of all the materials & labour (t&p)etc.complete. filling foundation and plint
Sector: PWD