Details: civil arc at phbmpl balasore (variable part) clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a hei ght of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared. supplying and filling selected earth/ moorum (excluding black cotton soil) from contractor's own borrow areas including royalty, wit h all leads and lifts in low laying areas and filling to required grade and level including watering, compacting at optimum moisture content to 90% of proctor's density, consolidation and rolling with 8 to 10 tonne power roller in layers not exceeding 20 cm thic kness, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and directions of the engineer-in-charge. earth work in excavation by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m i
Sector: Custom1