Details: dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately 200mm dia pipe supplying all materials and labour, t&p for earth work in excavation in trenches for laying pipes, specials in all kinds of soil including dressing and leveling the bed and depositing the soil within 50mtr., initial lead and 1.5mtrs. initial lift as per specification etc. all complete as per direction of engineer-in-charge. upto 1.50mtr. depth excavation of foundation in literate rock or any hard rock (other than granite or disintegrated rock) removed by chiseling including dressing and leveling the bed not exceeding 1.5mtr depth and depositing the soil within 50mtr initial lead as per specification approved by the deptt. etc. all complete as per dir
Sector: Water supply and Sewerage