Details: a. civil works:dismantling of false ceiling with gi frame including stacking material with in 50mtr lead including all cost of labour and material. all complete as per the direction of engineer-in-charge. dismantling and removing 2.5 cm thick artificial stone flooring including stacking the useful materials for reuse and removing the debris away from work site with all leads and lifts as per direction of engineer-in-charge. removing of cement plaster from walls including racking out joint to 12 mm deep and removing the debris away from work site with all leads and lifts as per direction of engineer-in-charge. dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris away from work site with all leads and lifts as per direction of engineer-in-charge. dismantling and removing i.e. marble chips flooring including stacking the useful materials for reuse and removing the debris away from wo
Sector: Generation