Details: earthwork in excavation of foundation in hard soil within 50m initial lead & 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3m in depth, with supply of all equipments, tools & plants, labour etc. including supervision charges, labour, cess, incidental charges & excluding gst etc. to complete as per direction of engineer-in-charge. supplying and filling foundation trenches & plinth with river sand well watered and rammed with all leads and lifts including cost, carriage, royalty, tools and plants, labour, labour cess required for the work with all incidental charges & excluding gst etc. to complete the item of work as per the direction of engineer-in-charge. providing and laying plain cement concrete m15 a40 (1:2:4) in foundation and plinth with 40mm size downgraded hard granite crusher broken stone aggregate from approved quarry, free from weathered skin, surface dust and any other deleterious materi
Sector: Irrigation