Details: soil testing, design, drawing, vetting, construction, cube testing, testing & commisioning of elevated service reservoir (esr) with pile/ raft foundation for following capacity &staging height at 20 mtr for all work such as soil investigation, excavation, back filling & disposal of earth,rcc & pcc of required grade,shuttering,brick work,painting,finishing,connection pipes beyond tank structure 15 mtr for each pipe,valves fitting,expansion joint,expansion below,mechanical level indicator lightening arrestor including supply of all labours, materials t & p etc all complete as per the direction of engineer-in-charge.zone-1 (30 mtr. st. ht.) zone-2 (25 mt. st. ht.) zone-5 (20 mt. st. ht.) zone-7 (25 mt. st. ht.) construction of watchman shed at zone- 5, zone-7 & wtp with toilet including internal electrification with light & fans & internal water supply along with sanitary installations for sewerage disposal system internal electrification including lighting & installation of fa
Sector: Water supply and Sewerage