Description: CONSTRUCTION OF BRICK WALL TO SUPPORT THE EARTH TOWARDS HIMALAYA HOSTEL BOUNDARY WALL IN PEC SECTOR 12 CHANDIGARH Name of Work CONSTRUCTION OF BRICK WALL TO SUPPORT THE EARTH TOWARDS HIMALAYA HOSTEL BOUNDARY WALL IN PEC SECTOR 12 CHANDIGARH
Details: Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil. (DSR 2.8.1) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 cement: 5 coarse sand (zone-Ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) (DSR 4.1.10) Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to fl
Sector: General Admin