Details: medium jungles: clearing medium jungles and trees up to 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed.(when 30% to 60 % of the area is covered by shrubs, trees etc.) collection and supply of river silt by truck carriage free from debries and other foreign material, etc. complete as directed.by manual means earth work in excavation of drainage channel to theproper grade and slopes as required includingdisposing the excavated debris/soil to a safe distance of minimum 50 m distance, etc. complete as directed.for lead up to 50 m and all lifts earthwork in bank trimming to the designed section / by manual means including removing the trimmed soils to a minimum distance of 30 m, complete as directed. supply of geo bags type-b (size 2.00 m × 1.50 m inner to inner) (pillow type) made of composite layers of polypropylene (pp) fibre as per is 16653:2017 for nonwoven and is 16654:2017 for woven:woven geo-textile f
Sector: Water Resource Department