Details: earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by engineer-in- charge:2.1.1 all kinds of soi providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, portland pozzolana/ordinary portland /portland cement, admixtures in recommended proportions as per is: 9103 to accelerate / setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the followinggrades of concrete.note: extra cement up to 10% of the minimum specified cement content in design mix shall be payable separatel
Sector: Buildings