Details: item no.1 earth work in embankment by mechanical means by truck carriage with locally available ordinary/ normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4 cm cube, dressing as per design section and compaction in layers not exceeding 30 cm in thickness and core cutter soil test at every layer and every 500 m distance, etc. complete as directed. a. compaction with three wheel static roller of 80-100 kn capacity for beyond initial 1 km & up to 10.00 km & for all lifts.lead = 4 km. item no. 2: turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth with jati bamboo split, watering till the grass grows for a lead up to 90 m and all lifts, etc. complete as directed.