Details: earthwork in bank trimming to the designed section / by mechanical means including removing the trimmed soils to a minimum distance of 30 m, complete as directed. earth work in excavation by hydraulic excavator, to proper grade and slopes as required including utilizing the spoils for filling works in the vicinity including removing roots & vegetation, dressing to design section etc. complete as directed.ordinary soil, for depth up to 3.00 m supply of geo-textile bags of type-a (1.03 × 0.70 m) inner to inner made of geo-textile non-woven fabric sheets of 400 gsm manufactured from 100% polypropylene (pp) fibre with minimum properties as per is 16653:2017i. wide tensile strength (md) ≥ 20kn/m & wide tensile strength(cd) ≥20 kn/m; ii. elongation (md) ≥50% & elongation (cd) ≥ 50%; iii. abrasion ≥ 95%; iv. trapezoidal tear strength (md) ≥ 450n & trapezoidal tear strength (cd) ≥ 450n; v. cbr puncture strength ≥ 4000n; vi. permittivity ≥ 1.10s – 1; vii. permeability ≥ 40l/m2/sec; viii. aos
Sector: Water Resource Department