Details: surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of , lead upto 50 m and lift upto 1.5 m. all kinds of soil. earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge. excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. for thickness of
Sector: Science University