Description: New Sub Divisional Office Building In Titabor PHE Sub Division Under The Programme SOPD G Name of Work NEW SUB DIVISIONAL OFFICE BUILDING IN TITABOR PHE SUB DIVISION
Details: FOUNDATION INCLUDING TIE BEAM FOR THE NEW BUILDING OF TITABOR PHE SUB-DIVISION OFFICE Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Brick work with common burnt clay modular bricks of class designation Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. CAST IN SITUProviding and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of co
Sector: Water supply and Sewerage