Details: light jungle: clearing light jungles and trees up to 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work up to a distance of 30 m, etc. complete as directed. (when 30% of the area is covered by shrubs, trees etc.) medium jungles: clearing medium jungles and trees up to 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed. (when 30% to 60 % of the area is covered by shrubs, trees etc.) felling trees including uprooting roots and stumps up to 50 cm. below ground, cutting into pieces and removing the same from the site of work etc. complete as directed. trees above 0.50 m and up to 1 m girth: earth work in embankment by tractor-trailer carriage in locally available ordinary soil excluding rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22 cm. thick includingploughing or roughening or benching the seats, removing all debris, breaking
Sector: Water Resource Department