Description: Repair and repainting of corridor walls including common area of Barak Hostel in IITG Campus Name of Work Repair and repainting of corridor walls including common area of Barak Hostel in IITG Campus
Details: 15 mm cement plaster on the rough side of single or half brick wall of mix : (a) 1:4 (1 cement: 4 fine sand) Cutting the existing crack in a 'V' shape groove cleaning the same with proper means Application of one coats of Epoxy Bonding Agent followed by application of Sika 214 non- shrinkage powder over the entire crack area and let dry. Finally plaster the surface wherever necessary. Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : (a) Water thinnable cement primer Distempering with 1st quality acrylic distemper (ready mixed) of approved manufacturer, of required shade and colour complete, as per manufacturer's specification. (a) Two or more coats on new work Painting with synthetic enamel paint of approved brand and manufacture to give an eve
Sector: Science University