Description: CE EAP ARRBP OCB Bridges 2 Chirang 03 i Br No 1 1 on Uttar Islakata to Dorogaon Village Road ii Br No 1 1 on Khamarpara to Tengnamari Road Name of Work Construction of Bridges in Chirang district i Br No 1 1 on Uttar Islakata to Dorogaon Village Road ii Br No 1 1 on Khamarpara to Tengnamari Road
Details: Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed.i) Br. No. 1/1 on Uttar Islakata to Dorogaon Village Road Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department)i) Br. No. 1/1 on Uttar Islakata to Dorogaon Village Road Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nut
Sector: Road development