Description: CE EAP ARRBP OCB Bridge 1 Barpeta 19Construction of Bridge in Barpeta district i Br No 1 1 on NH 127 A to Turkuni River Swahid Pranay Kalita Road Name of Work Construction of Bridge in Barpeta district i Br No 1 1 on NH 127 A to Turkuni River Swahid Pranay Kalita Road
Details: Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed. Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) Construction of temporary Bamboo bridge of 3.70m clear road way with Bholuka or Barua Bamboo post 5nos. in each rows driven at least180cm. below ground level and rows not more than 150cm apart from center to center Bholuka or Barua Bamboo dham longitudinal groth both closely placed and tied with half bamboo 90cm to 120cm apart in both layers and ttwo layers of jati bamboo chattais ( top layer should be digonally woven), 70 mm to 100 mm thick brushwood in between chattias should be tied with half jati bamboo on both ends, bamboo railing with bholu
Sector: Road development