Description: CE EAP ARRBP OCB Bridge 1 Barpeta 20 Construction of Bridge in Barpeta district i Br on Sikartary ME school to Sikartary Pather Road Name of Work Construction of Bridge in Barpeta district i Br on Sikartary ME school to Sikartary Pather Road
Details: Providing and constructing temporary island for construction of well foundation complete as per technical specification. (C) For 8.0 m dia well - Depth of Water above 3.0 m Providing and constructing one span service road to reach island location from one pier location to another pier location Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.I) Ordinary Soil. A. Manual meansi) depth upto 3.0m (without dewatering) Providing and Laying Cutting edge of mild steel Weighing 40kg per metre for well foundation complete as per drawing and as per clause 1200&1900 of MORTH Specifications Plain/Reinforced Cement concrete, in Well Foundation complete as per Drawing and as per clause 1200,1500&1700 of MORTH SpecificationsA.
Sector: Road development