Description: CE EAP ARRBP OCB Bridge 1 Chirang 02 Construction of Bridge in Chirang district i Br No 1 2 on Khagrabari to Kasudola Road Name of Work Construction of Bridge in Chirang district i Br No 1 2 on Khagrabari to Kasudola Road
Details: Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed. Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) Providing and constructing temporary island for construction of pile foundation with depth of water upto 4.0m complete as per technical specification. Providing and constructing one span service road to reach island location from one pier location to another pier location Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground l
Sector: Road development