Details: clearing grass and removal of up to a distance of 30m outside the periphery of the area as per the technical specification clause 201. 6.40 m x(1500m+1500m) construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting p gto meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 providing signboard fitting and fixing
Sector: Horticulture