Details: part-a: for pipelines section having length 0 to 20 km desktop study & reconnaissance survey as per standard specifications (including submission of report)carrying out reconnaissance survey of the pipeline route including desktop study followed by ground truth verification, evaluation of alternative routes, preparation of route maps, crossing details and submission of reports in three copies complete as per specifications and direction of engineer-in-charge/ site engineer (for new/ additional rou). detailed engineering survey (including submission of report)carrying out detailed engineering survey of the entire pipeline route, as per the detailed scope of work in special conditions of contract (scc) including but not limited to the following: deploying differential global positioning to provide dgps control points at every 4 to 5 km interval based on wgs-84 utm coordinate system; deploying total stations for traverse control between dgps stations; establishing utm coordinates of all t
Sector: Petroleum