Details: (a) bridge work foundationexcavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.ordinary soilmanual means(i) without dewateringupto 3.00 m depth excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.ordinary soilmanual means(i) without dewateringupto 3.00 m to 6.00m depth providing and laying cutting edge of mild steel weighing 40 kg per metre for well foundation complete as per drawing and as per clause 1200 & 1900 of mort&h specification . plain/reinforced cement concrete, in well foundation complete
Sector: PWD