Details: (a) road work:clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201 .(l) by manual means . (a) in area of non thorny jungle. scarifying existing granular surface to a depth of 50mm and disposal of scarified material with a lift upto 3.0m and lead upto 1000m as per technical specification clause 301.4by manual means earth work in excavation for roadway in soil using mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and site slopes in accordance with requirement of lines, grades. construction of embankment with approved material obtained fr
Sector: PWD