Details: (a) road work:clearing and grubbing road land (clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201 .(i) by manual means . (a) in area of non thorny jungle. removing all types of hume pipes and stacking within a lead of 1000 m including earthwork and dismantling of masonry works as per technical specification clause 202.b) above 600 mm to 900 mm dia hume pipe dismantling of structures (dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled mater
Sector: PWD