Description: ESTABLISHMENT OF NEW DAO OFFICE BUILDING AT GOALPARA UNDER APART Name of Work Construction of DAO Office Building at Goalpara Assam
Details: CIVIL WORKS (SCHEDULE) EARTHWORK: EARTHWORK IN EXCAVATION Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1%concentr
Sector: Agri Marketing