Description: Proposed Connecting bridge at Kamakhya Prashaanti Lodge Name of Work Proposed connecting Bridge at Kamakhya Prashaanti Lodge
Details: EARTH WORK Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan)including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete. PLAIN CONCRETE WORKS Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from naturalsources : 8 graded stone aggregate 40 mm nominal sizederived from natural sources) Making plinth protection 5
Sector: Tourism