Description: Protection of Neamatighat from erosion of River Brahmaputra Phase I Name of Work Protection of Neamatighat from erosion of River Brahmaputra Phase I
Details: Supply of Pre stressed Cement Concrete (PSC) Porcupine members of size 0.10mx0.10mx3.00m with M-30 grade of cement concrete(Details as per Schedule D) Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10m x 0.10m x 3.0m from the stack yard to the place of launching, of the Porcupine with 6(six) members properly, supplying & fitting/fixing with 12mm dia 25cm long M.S. Nuts and Bolts and launching the porcupine properly as directed (Lead up to 150m)Launching with Boat Launching without boat Earthwork in bank trimming to designed section/ including removing the soils at a safe distance completed as directed.
Sector: Water Resource Department