Description: Construction of Approach Boring of well points along with Installation Construction of Underground PVC distribution system Spout chambers Gate proof fencing Supporting Pillars Sign board etc Name of Work Solar Powered MDTWS 4 Points under Hajo LAC under RIDF NABARD XXVIII for the year 2022 23 under Hajo Jalukbari Division I
Details: Construction Approach Road (Qnty. for 4 Pts) Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).As per CE(I) SOR 19-20 SL.no.6.16 (A) Boring and Installation of Tube Well (Qnty. for 4 Pts) Item No. 1 : Movement of drilling Rig , Tools & Plants, Accessories including drill pipes, casing pipes etc. to drilling site and back. Item No. 2 : Boring of DTW of bore hole up to 450mm dia and up to a depth of 70 M or up to required depth by RC/DR Drilling Rig includ
Sector: Irrigation