Description: Construction of 100 SQM Bamboo Structure Poly House for the State Floriculture Mission Name of Work Model estimate for Construction of 100 Sq m Bamboo Structure Poly House
Details: Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming ofbottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of 50 m.2.8.1 All kinds of soil. Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinth level:4.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from naturalsources : 4 graded stone aggregate 20 mm nominal size derived fromnatural sources) Bhaluka Bamboo Post( upto a height of 3.00M) Jati Bamboo for Purlins etc Shade Net: Supply & fixing 50% shading mesh for ceiling with the help ofZig-Zag spring. Polyethylene film for roof: Supplying and fixing of 200 micron U.Vstabilized 5-layered, poly film, for roof, vertical area between eve andarch on globe ends with the help of
Sector: Horticulture