Description: SITC of 15 KWp Solar Power Plant at 03 BOPs i e BOP Muktar Namitsering and Marme of 67 Bn SSB Lumla under FTR HQ SSB Tezpur Name of Work SITC of 15 KWp Solar Power Plant at 03 BOPs i e BOP Muktar Namitsering and Marme of 67 Bn SSB Lumla under FTR HQ SSB Tezpur Name of Work SITC of 15 KWp Solar Power Plant at 03 BOPs i e BOP Muktar Namitsering and Marme of 67 Bn SSB Lumla under FTR HQ SSB Tezpur
Details: Supplying, installation,testing and commissioning of 15 KWP off Grid Solar power plants confirming to MNRE/BIS specifications consisting of Mono Crystalline silicon solar cells,necessary protections,earthing for the solar system,mounted on prefabricated GI Structure of suitable strength with the following components complete as required inculding repair/maintence of solar power plant/equipment for its satisfactory working for a period of 05 years after installation of solar power plant.a)15 KWP Solar photovoltaic module of Capacity 390 Wp.or above.manufactured in india.confirming to IS14286/IEC 61215,IS/IEC 61730 part-1,IS/IEC 61730-Part-2.solar photovoltaic module conversion efficiency shall not be less than 16.5% PV modules used in solar power plants/system must be warranted for the out put peak watt capacity,which should not be less than 90% at the end of 10 Years and 80% at the end of 25 Years.b)Fixing of Array junction box & Main Junction box with IP 65 protection and termination
Sector: Police and Internal Security