Details: dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per technical specification clause 201. (b)lead upto 1000 m (vi) girth above 4500 mm uprooting and removing stumps & roots,compaction of backfilling and staking of servicable material by manual means as per technical specification clause 201. (b) lead upto 1000 m (vi) girth above 4500 mm excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 (manual method should be adopted where ma
Sector: Road development