Details: earthwork in excavation of foundation of structures as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. (i) ordinary soil (a) manual means (depth upto 3 m) (without dewatering) removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per clause 303.5.2 as per technical specification clause 302.3.11 providing and laying of dry rubble flooring complete as per drawings and technical specifications clause 1303.3 providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 (a )with crushed stone (iii) p.c.c grade m15 supplying
Sector: Road development