Details: clearing and grubbing road land including uprooting wild vegetation, grass,bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking ofserviceable material to be used or auctioned, upto a lead of 1000 m includingremoval and disposal of top organic soil not exceeding 150 mm in thickness asper technical specification clause 201 (ii) by mechanical means:- a. in area of non throny jungle construction of embankment with approved material obtained from borrow pitswith a lift upto 1.5 m, transporting to site, spreading, grading to required slopeand compactingto meet requirement oftables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 (a) from private land construction of subgrade and earthen shoulders construction of subgrade and earthen shoulders with approved material obtained from borrow pit
Sector: Road development